Watch as ASU cubesat gets launch 'dress rehearsal'


A NASA transporter sits outside a large building.

The Arizona State University-led LunaH-Map cubesat will be one of 10 cubesats that will roll to the launch pad aboard the Artemis I rocket beginning Thursday afternoon for what the space agency calls a “wet dress rehearsal. The rocket’s 4-mile journey will consist of a shakedown of tests where the rocket will be fueled and run through a countdown — but no liftoff. If everything checks out, the actually blast-off will probably come in May or June. 

LunaH-Map’s full NASA name is the Lunar Polar Hydrogen Mapper. It’s a fancy name for an instrument that will hopefully locate water ice in the permanently shadowed regions of the moon.

“Some of the coldest places in the solar system,” says Craig Hardgrove, an assistant professor in ASU’s School of Earth and Space Exploration and the principal investigator of LunaH-Map.

Hardgrove and the ASU team last touched and saw the cubesat when they delivered it to Kennedy Space Center in July of last year. Artemis I will be the first of three planned NASA Artemis Program launches, as NASA prepares to send humans back to the moon. LunaH-Map, which is the first mission that has ever been led by ASU, will ride along on this launch with the other cubesats as secondary payloads.

Video by Steve Filmer/ASU

Live coverage for rollout begins at 5 p.m. EDT/2 p.m. Arizona time on Thursday, March 17, and will include remarks from NASA Administrator Bill Nelson and others. Coverage will air on NASA Television, the NASA app and the agency’s website. The Kennedy Newsroom YouTube channel will stream live, static camera views of the debut and arrival at the pad starting at 4 p.m. EDT/1 p.m. Arizona time. The rollout involves a 4-mile journey between the Vehicle Assembly Building and the launch pad, expected to take between six and 12 hours.

Top photo: The crawler-transporter 2, driven by engineers and technicians, arrives at the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida on March 11. The crawler will go inside the VAB, where it will slide under the Artemis I Space Launch System with the Orion spacecraft atop on the mobile launcher and carry it to Launch Complex 39B for a "wet dress rehearsal" test ahead of the Artemis I launch. Artemis I will be the first integrated test of the SLS and Orion spacecraft. In later missions, NASA will land the first woman and the first person of color on the surface of the moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars. Photo by Kim Shiflett/NASA

More Science and technology

 

Close-up of a DNA double helix with colorful bokeh lights and network lines in the background.

ASU professor wins NIH Director’s New Innovator Award for research linking gene function to brain structure

Life experiences alter us in many ways, including how we act and our mental and physical health. What we go through can even change how our genes work, how the instructions coded into our DNA are…

Photo of the ISPMHA group at ASU with Olivia Davis in the center

ASU postdoctoral researcher leads initiative to support graduate student mental health

Olivia Davis had firsthand experience with anxiety and OCD before she entered grad school. Then, during the pandemic and as a result of the growing pressures of the graduate school environment, she…

Silhouettes of an adult and a child facing each other.

ASU graduate student researching interplay between family dynamics, ADHD

The symptoms of attention deficit hyperactivity disorder (ADHD) — which include daydreaming, making careless mistakes or taking risks, having a hard time resisting temptation, difficulty getting…